Triangle Strategic Tolling Study

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

The DCHC MPO adopted the Triangle Strategic Tolling Study on October 9, 2019. The Tolling Study explores toll and express lanes for the region, identifies potential toll projects for inclusion in the long-range plans, and creates a framework for the MPO to discuss and evaluate toll projects. If the region pursues the construction of toll lanes, a much more in-depth, comprehensive study would be completed on that particular toll project and would produce detailed data and identify key design and policy decisions.

The key final documents include:

The following documents are from additional products of the study:

Contact

You can direct questions and comments to:

Andy Henry
919-503-4134
andrew.henry@dchcmpo.org

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer